Here’s how to comment on new Mobile River Bridge options

br_gallery2

ALDOT engineers have designed three options for the new I-10 river bridge and for possible bike and pedestrian paths.

Option one would create a path along the Africatown bridge.

Voters can also choose to cut off the Bankhead tunnel to drivers in order for it to be used exclusively for pedestrian traffic.

The last option is to build the walkway directly into the new Mobile River Bridge.

Click here to access mobileriverbridge.com to weigh-in.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s